Nuclear Power Plant Emsland in Lingen/Ems, pressurized water reactor with an electric gross output of 1,400 MW, nuclear commissioning on 14th April 1988. The German Atomic Energy Act, amended in 2011, stipulates that the Emsland nuclear power plant will lose its operating license at the latest by 31st December 2022. Following the amendment to the German Atomic Energy Act, the plant has permanently been shut down on 15th April 2023. Lifetime generation: 360.77 TWh