ITER Cryostat Lower Cylinder Has Been Installed

ITER Cryostat Lower Cylinder Has Been Installed A major assembly milestone has been achieved at Cadarache, the International Thermonuclear Experimental Reactor (ITER) site. The cryostat lower cylinder has been installed, reaching its position above the base sector. The installation process has been long and very cautious and started on 22 August, when a 192-wheel self-propelled…