Nuclear power plant RWE-Bayernwerk in Gundremmingen/Danube (Germany), boiling water reactor with an electric gross output of 250 MW, nuclear commissioning on 14th August 1966, final shutdown in January 1977; cumulative power generation 15 TWh. Decommissioning was approved on 26th May 1983. Dismantling was “far advanced” in 2005.

In 2006, the Gundremmingen Technology Centre in the former turbine house of the 250MW unit Gundremmingen A was approved by the Bavarian Ministry of the Environment. Here, plant components that are removed from the nuclear power stations can be dismantled, cleaned and prepared for disposal.