Nuclear Power Plant Gundremmingen/Danube (Germany), unit B, boiling water reactor with an electric gross output of 1,344 MW, nuclear commissioning on 9th March 1984.

In line with the Atomic Energy Act, unit B was permanently decommissioned at the end of 2017. The licence for dismantling unit B according to the Atomic Energy Act was granted by the Bavarian State Ministry of the Environment and Consumer Protection in March 2019.